Empennage · Elevator — Work Session (1h 18m)
Empennage · Work package 9 Elevator · 1h 18m · Plans: Page 9-6, Section 9, Step 1-8
As most of the parts are already drilled to size, this was quite straight forward. Still checked all holes (a few of each row) with a rivet though.
← All entries in this build log