Empennage · Tailcone — Work Session (2h 47m)
Empennage · Work package 10 Tailcone · 2h 47m · Plans: Page 10-5, Section 10, Step 2
Started with the tailcone stiffeners. Measuring, and drawing the rivet lines.
Also, the thread tap arrived so I could finish the step I left out before.
← All entries in this build log