Empennage · Elevator — Work Session (2h 36m)
Empennage · Work package 9 Elevator · 2h 36m · Plans: Page 9-15, Section 9, Step 7
Cut the foam ribs as well as the counterbalance weights. The weights had quite some cavities, nevertheless I created two matched pairs (+-2gram). I hope they turn out a bit heavy so they can still be adapted to the proper weight when everything is painted.
← All entries in this build log