Empennage — Work Session (4h 53m)
Again, a lot of dimpling, scuffing and deburring. There are really a lot of parts on this tailbone. While disassembling, I remembered that I wanted to add a second pair of Naca Vents for the overhead console. Will do this after the priming (cutting extra carefully).