Empennage · Tailcone — Work Session (2h 1m)
Empennage · Work package 10 Tailcone · 2h 1m · Plans: Page 10-8, 10-9, 10-10, Section 10, Step 1-6
I really love the pre-drilled kit, if there are holes, the chance that everything fits (just perfect) is really high. An easy fit check using the proper rivet and it really allows to just cleco everything together and rush through the plans pages. Just like Lego.
← All entries in this build log