Empennage · Horizontal Stabilizer — Work Session (1h 9m)
Empennage · Work package 8 Horizontal Stabilizer · 1h 9m · Plans: Page 2-3, Section 8, Step 6-2
Riveted the spar doubler and hinge brackets, as well as bolted the inboard hinge bracket.
← All entries in this build log