Empennage · Elevator — Work Session (1h 23m)
Empennage · Work package 9 Elevator · 1h 23m · Plans: Page 9-18, Section 9, Step 9-10
The Tanksealant for the Elevator trim tabs arrived! It seems like ProSeal can not be shipped internationally, whereas FlameMaster sealant (which I understood is basically the same) can.
Nevertheless, elevator trim tabs done!
← All entries in this build log