Empennage · Elevator — Work Session (3h 21m)
Empennage · Work package 9 Elevator · 3h 21m · Plans: Page 7,14,15, Section 9, Step 2, 1-3,1-4
Finally, the Elevator Horn arrived. I can start finalizing the the Elevators and the trim tabs. Tailcone Assembly here we come!
← All entries in this build log