Empennage — Work Session (2h 31m)
First rivets have been set and I started the final assembly of the skeleton.
For the two rivets between the top Rudder attachment brackets, I had to use the lathe to turn a bucking bar/die holder that fits between those.
Bottom rudder hinge attachment bolts torqued to 1.6Nm and sealed.