Empennage · Vertical Stabilizer — Work Session (2h 31m)
Empennage · Work package 6 Vertical Stabilizer · 2h 31m · Plans: Page 4-5, Section 6, Step 1-3
First rivets have been set and I started the final assembly of the skeleton.
For the two rivets between the top Rudder attachment brackets, I had to use the lathe to turn a bucking bar/die holder that fits between those.
Bottom rudder hinge attachment bolts torqued to 1.6Nm and sealed.