Empennage — Work Session (1h 25m)
Stabilizer ready for Assembly. I steady riveted in the Nose Ribs, now waiting for the inspection (which is scheduled for Tuesday 4.08.2026) so I can finish with the Rudder, HS / VS stabilizer as well (if I can make it in time) the elevators.