Empennage · Elevator — Work Session (1h 2m)
Empennage · Work package 9 Elevator · 1h 2m · Plans: Page 19, Section 9
Finished the elevator (except for beding the hinge pin, that will be done tomorrow). Averything goes rotated that should rotate and everything is fixed that should stay in place. Next is the assembly of the empennage!
← All entries in this build log