Empennage · Tailcone — Work Session (2h 24m)
Empennage · Work package 10 Tailcone · 2h 24m · Plans: Page 10-21-22, Section 10, Step 5,1-2
Finalized the installation of the rudder cable fairings which allowed me to install the Aft Tailcone deck. A lot of thick rivets to be set in uncomfortable positions.
← All entries in this build log