Empennage · Horizontal Stabilizer — Work Session (1h 54m)
Empennage · Work package 8 Horizontal Stabilizer · 1h 54m · Plans: Page 3, Section 8, Step 1
Deburred and primed the bushing. Already went ahead and built the Stabilizer jigs with material from the crate.
← All entries in this build log